MIL-STD-2148(SH)
12 August 1983
CONTENTS - Continued
Page
Tile cutting - - - - - - - - - - - - - - - - - - - --
40
Paragraph 5.3.4.1
Preparation of adhesives - - - -- - - - - - - - -- - - -
40
5.3.5
Adhesive pot life - - - - - - - - - - - - - - - - - - - -
40
5.3.5.1
Preheating - -- - - - - - - - - - - - - -- - - - - - - - -
40
5.3.5.2
Cleaning - - - - - - - - - - - - - - - - - - - - - - - - - - - --
40
5.3.5.3
40
Tile installation --------------------
5.3.6
Fitting of tiles - - - - - - - - - - - - - - - - - - - -- - -
40
5.3.6.1
Preforming ------------------------------
41
5.3.6.2
Precautions ---------------------------
41
5.3.6.3
Bonding --------------------------------
41
5.3.6.4
Paint application - - - - - - - - - - - - - - - - - -- - -- --
41
5.3.7
Preparation --------------------------------
41
5.3.7.1
Protective coatings ----------------------
41
5.3.7.2
Antifouling paints ------------------------
42
5.3.7.3
Habitable area paints -----------------------
42
5.3.7.4
Maintenance procedures ---------------------
42
5.3.8
42
5.3 8.1
Cleaning of hull plate and bulkhead tiles ---
42
5.3.8.2
Cleaning of tiles inside fuel tanks ----------
Repair of damping treatment ----------------
42
5.3.8.3
Minor damage ----------------------------
42
5.3.8.3.1
Major damage ------------------------------
43
5.3.8.3.2
Requirements for the installation of type V,
5.4
(MIRL No.3) class 1 damping tiles on steel
plate 1/2 inch or less in flooded and non-
flooded areas ---------------------------
43
Materials --------------------------------
43
5.4.1
Damping tiles ----------------------------
43
5.4.1.1
Adhesive ------------------------------
43
5.4.1.2
Restraining materials ---------------------
43
5.4.1.3
Protective materials ----------------------
44
5.4.1.4
Cleaning materials -----------------------
44
5.4.1.5
5.4.2
Safety precautions and environmental control
(see 6.3) - - - - - - - - - - - - - - - - - -- - -- - - - - --
44
Handling of damping tiles - -- - - - - - - - - - - - -
5.4.2.1
44
Handling of bonding materials - - - - - - - - - - - --
5.4.2.2
44
Environmental requirements ----------------
5.4.2.3
44
5.4.3
Surface preparation prior to installation of
type V, class 1 damping tiles - -- - - - - - - - - -
45
Installation of studs - - - - - - - - - - - - - - -- - - --
5.4.3.1
45
Protecting the stud threads ---------------
5.4.3.1.1
45
5.4.3.2
Cleaning and painting of steel surfaces inside
ballast and trim tanks and inside all other
flooded spaces (sonar domes, super-structure
spaces and fairwaters) --------------------
45
5.4.3.3
Cleaning and painting steel surfaces of
foundations, bulkheads, platform decks, dry
side of tanks and all other non-flooded
spaces --------------------------------
46
ix
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business