MIL-STD-2148(SH)
12 August 1983
CONTENTS - Continued
Page
Foundations, bulkheads, platform decks
Paragraph 5.1.3.3
24
and tanks (dry side only) ----------------
Gear cases and structures which operate at
5.1.3.4
temperatures of 80 to 155°F------------
24
Non-steel surfaces -----------------------
24
5.1.3.5
Galvanized coatings ----------------------
25
5.1.3.5.1
Fitting of tiles -----------------------------
25
5.1.4
Areas requiring a restraining layer --------
25
5.1.4.1
25
Areas not requiring a restraining layer ------
5.1.4.2
Fitting around weld beads ------------------
25
5.1.4.3
Drilling and punching holes -----------------
26
5.1.4.4
Preforming -------------------------------
26
5.1.4.5
Preparation of the adhesive ----------------
26
5.1.5
Adhesive pot life ----------------------
26
5.1.5.1
Preheating - - - - - - -- - - - - - - - - - - - - - - - - - --
26
5.1.5.2
Cleaning - -- -- - - - - - - - - -- - - - - - - - - - - - --
26
5.1.5.3
Installation of damping materials -----------
27
5.1.6
Ballast and trim tank interiors (type II,
5.1.6.1
class 1 tiles only) -----------------------
27
27
Installation of the restraining layer --------
5.1.6.1.1
Installation of type II, class 1, 2, and 3
5.1.6.2
tiles in areas not requiring a restraining
layer - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
28
Paint application ----------------------
28
5.1.7
Corrosion protection and habitability area
5.1.7.1
paints -----------------------------------
28
Antifouling paints -----------------------
28
5.1.7.2
Maintenance procedures --------------------
28
5.1.8
28
Cleaning of tiles and restraining layers -----
5.1.8.1
29
Repair of minor damage to damping treatments -
5.1.8.2
29
Repair of major damage to damping treatments -
5.1.8.3
Replacing missing studs ------------------
29
5.1.8.3.1
Repainting - - - - - - - - - - - - - - - - - - - - - - - - - --
29
5.1.8.3.2
Requirements for installation of type II
5.2
damping tiles on heavy steel plate, 3/4-inch
or greater ------------------------------
30
Materials ----------------------------------
30
5.2.1
Damping tiles ------------------------------
30
5.2.1.1
Adhesive ------------------------------------
30
5.2.1.2
Constraining materials -------------------
30
5.2.1.3
Protective materials ----------------------
31
5.2.1.4
Cleaning materials ------------------------
32
5.2.1.5
32
5.2.2
Safety precautions and environmental control -
Surface preparation prior to installation of
5.2.3
damping tiles -----------------------------
32
Attachment of studs ---------------------
32
5.2.3.1
Protection of stud threads - - - - - - - - - - - - -
32
5.2.3.1.1
vii
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business