MIL-STD-2148(SH)
12 August 1983
CONTENTS - Continued
Page
Cleaning and coating of the steel surfaces
Paragraph 5.2.3.2
(wet areas only) ------------------------
32
5.2.3.3
Cleaning and coating of the steel surfaces
(dry areas only) ----------------------
33
5.2.4
Selecting and fitting of the constraining
layer - - - - - - - - - - - - - - - - - - - - - - - - - -
33
Painting - - - - - - - - - - - - - - - - - - - - - - - - - - -- -
33
5.2.4.1
Fitting of tiles - - - - - - - - - - - - - - - - - - - - - -
34
5.2.5
Drilling and punching holes - - - - - - - - - - - -
34
5.2.5.1
cutting ------------------------------
34
5.2.5.2
Preparation of the adhesive -----------------
34
5.2.6
Adhesive pot life ------------------------
34
5.2.6.1
Preheating ---------------------------------
34
5.2.6.2
Cleaning -----------------------------------
34
5.2.6.3
Installation of damping materials -----------
35
5.2.7
Insulation sleeving ---------------------
35
5.2.7.1
Damping tiles - - - - - - - - - - - - - - - - - - - -- -
35
5.2.7.2
Constraining layer -----------------------
35
5.2.7.3
Insulating washers -----------------------
35
5.2.7.4
Paint application - - - - - - - - - - - - - - - - - - - - -
36
5.2.8
5.2.8.1
Corrosion protection and habitable area
paints ----------------------------------
36
Antifouling paints ---------------------
36
5.2.8.2
Maintenance procedures ------------------
36
5.2.9
Cleaning of damping treatment - - - - - - - - - --
36
5.2.9.1
Minor repair of damping treatment - - - - - - - - -
36
5.2.9.2
Major repair of damping treatment -----------
36
5.2.9.3
Requirements for installation of type III
5.3
damping tiles ---------------------------
37
Materials -------------------------------
37
5.3.1
Damping tiles - - - - - - - - - - - - - - - - - - - - - - --
37
5.3.1.1
Adhesive ----------------------------------
37
5.3.1.2
Protective materials ----------------------
37
5.3.1.3
Cleaning materials -----------------------
37
5.3.1.4
37
Safety precautions and environmental control -
5.3.2
Handling damping tile --------------------
37
5.3.2.1
Handling of bonding materials - - - - - - - - - - - -
37
5.3.2.2
Environmental requirements ----------------
37
5.3.2.3
5.3.3
Surface preparation prior to installation of
tiles ----------------------------------
38
Hull, keel, frames, bulkheads and underside
5.3.3.1
of platform decks (dry spaces only) ---------
38
Bilges, bilge wells, peak tanks and sumps
5.3.3.2
38
(wet spaces only) ----------------------
Fuel tanks --------------------------------
39
5.3.3.3
5.3.3.4
Floodable spaces other than fuel tanks
39
(sonar domes and saltwater tanks) ---------
Preparation of tiles --------------------
40
5.3.4
viii
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business