MIL-STD-2148(SH)
12 August 1983
CONTENTS - Continued
Page
Fitting of tiles - - - - - - - - - - - - - - - - - - - - - --
Paragraph 5.4.4
46
Areas requiring a restraining layer - - - - - - -
46
5.4.4.1
Areas not requiring a restraining layer ------
46
5.4.4.2
Areas of weld beads -----------------------
5.4.4.3
46
Drilling and punching holes - - - - - - - - - - - - --
5.4.4.4
46
Cutting -- - - - - - - - - - - - - - - - - - - - - - - --
5.4.4.5
47
Preparation of the adhesive - - - - - - - -- - - - --
47
5.4.5
Adhesive pot life -----------------------
5.4.5.1
47
Preheating ------------------------------
5.4.5.2
47
Cleaning - - - - - - - - - - - - - - - - - - - - - - - -
5.4.5.3
47
Installation of damping materials - - - - - - - --
5.4.6
47
Damping tiles -------------------------
5.4.6.1
47
Restraining layer - - - - - - - - - - - - -- - - - -- - -
5.4.6.2
47
Installation of tiles In areas not requiring
5.4.6.3
a restraining layer - - - - - - - - - - - - - - - - - - --
48
Reventing the tiles from slipping - - - - - - -
5.4.6.3.1
48
Paint application -----------------------
5.4.7
48
5.4.7.1
Corrosion protection and habitability area
paints --------------------------------------
48
Antifouling paints -------------------------
5.4.7.2
48
Maintenance procedures ---------------------
5.4.8
49
Cleaning of tiles and restraining layers -----
5.4.8.1
49
5.4.8.2
Repair of minor damage to damping treatments -
49
5.4.8.3
Repair of major damage to damping treatments -
49
Replacement of missing studs - - - - -- - - - -- --
5.4.8.3.1
49
5.5
Requirements for the installation of type V,
(MIRL NO. 3) class 2 damping tiles on 9/16
to 3/4-inch steel plate in non-flooded
areas ------------------------------------
50
Materials --------------------------------
5.5.1
50
Damping tiles - - - - - - - - - - - - - - - - - - - - - - - -
5.5.1.1
50
Adhesive - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5.5.1.2
50
5.5.1.3
Constraining materials -----------------------
50
Protective materials - - - -- - - - - - - - - - - - - - - -
5.5.1.4
50
Cleaning materials ------------------------
5.5.1.5
50
5.5.2
Safety precautions and environmental control -
51
Handling of bonding materials - - - - - - - - - - -- --
5.5.2.1
51
5.5.2.2
Environmental requirements -------------------
51
5.5.3
Surface preparation prior to installation of
type V, class 2 tiles - - - - - - - - - - - - - - - -
51
Attachment of studs --------------------
5.5.3.1
51
5.5.3.1.1
Protecting the stud threads -----------------
51
5.5.3.2
Cleaning and painting the steel surfaces ----
51
5.5.4
Fitting the type V, class 2 tiles and the
constraining layer ----------------------
52
Drilling and punching holes ---------------
5.5.4.1
52
cutting ----------------------------------
5.5.4.2
52
5.5.5
preparation of the adhesive ------------------
52
x
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business